United Arab Emirates

Summary

Nuclear Power Reactors

2

0

0

0



Annual Electrical Power Production

0.00 GW.h

0.00 GW.h

Reactors

Name Type Status Location Reference Unit Power
[MW]
Gross Electrical Capacity
[MW]
First Grid Connection
BARAKAH-1 PWR Under Construction Ruwais 1345 1400 2016-11-02
BARAKAH-2 PWR Under Construction Ruwais 1345 1400 2017-11-02


Above data are from the PRIS database. Last update on 2014-07-28

Previous  (Ukraine) (United Kingdom)  Next